Renton School District Transportation Center

Redevelopment of the existing Transportation Facility included the replacement of the existing buildings on site with a new 16,638 square foot bus maintenance and operations center, a new 3,605 square foot service building for fleet fueling and bus wash, a bus storage lot, vehicle parking lot, and updated landscaping.

The two-story maintenance and operations center is steel framed with a metal siding and CMU block exterior. The facility contains six maintenance bays with multiple in-ground hydraulic lifts and a metallic floor hardener in the maintenance area. The building has an open-web steel joist roof system with TPO roofing and aluminum windows.

More Projects